This website uses cookies to ensure you get the best experience on our website. By continuing to use this site, you agree to our cookie  & privacy policy.Accept

Scope of the call

We are looking to speak to experts with experience in Power Plant Overhaul Optimization

Top tier management consulting firm

Expected date of call: 1/06/2022 or 1/06/2022

Minimum experience Needed: 15 Year(s)

BROAD CATEGORY

Manufacturing/Operations

Sub CATEGORY

Manufacturing/Operations head

INDUSTRY

Renewable Energy - Producers

Domain Expertise Needed

Overhaul Optimization boilerTurbine

Required experience in organisation like

Power Mech Siemens Black & Veatch Tata Power Engie Dominion EnergyNTPC Kepco Duke Energy Steag Precision Engineering E.ON Schneider GE

Have worked in roles like

Operations Head

Question You Would be expected to answer

  • As per your experience, what should be the time taken for boiler overhaul, turbine overhaul and generator overhaul for a 660 MW supercritical unit
  • Have you incorporated initiatives wrt automation/mechanization/digitization which led to reduction of critical path time. If yes, would you be comfortable having a detailed discussion on the same.